BACK
- ON THE 145TH ANNIVERSARY OF TSNIIPSK named after MELNIKOV
- Crane Runway Beam Reconstruction In An Operational Converter Shop
- UDC 624.073.4
doi: 10.33622/0869-7019.2025.11.34-39
Denis E. GOLUBEV1, d.golubev@stako.ru
Konstantin M. SOFRONOV1, k.sofronov@stako.ru
Vadim V. KOSENKOV1, v.kosenkov@stako.ru
Aleksey V. SHURINOV1, a.shurinov@stako.ru
Larisa V. KRASOTINA1,2, krasotina@stako.ru
1 Melnikov Central Research and Design Institute of Steel Structures, ul. Krzhizhanovskogo, 21/23, korp. 1, Moscow 117218, Russian Federation
2 Siberian State Automobile and Highway University (SibADI), prospekt Mira, 5, Omsk 644080, Russian Federation
Abstract. One of the key elements of convector workshops of metallurgical enterprises is crane beams, which ensure the movement of crane equipment, loading of the charge, transportation of metal buckets and a number of other technological operations. Crane beams are subjected to significant dynamic and temperature loads, so their operation and timely maintenance are critically important to ensure durability and safe operation in difficult metallurgical production conditions. As a result of repeated cyclic application of the load, fatigue cracks appear and gradually develop in the supporting areas of the ball, which can eventually lead to the complete destruction of structures. Fatigue failure, unlike static failure, can occur even at low stresses, which do not exceed half of the static strength. The article analyzes the operation of the crane beam of the converter shop at the pig iron overflow site with a heavy duty overhead crane. The results of research and development work on the repair (reinforcement) of crane structures are presented. The defects of the beams under consideration are systematized, a method for restoring its bearing capacity and extending its service life is proposed.
Keywords: crane runway beams, converter shop, crane runway operation, steel structures, fatigue damage, durability of the structure - REFERENCES
1. Pat. Russian Federation No. 2196721. A method for restoring crane beams with fatigue cracks. Nezhdanov K. K., Vasil'ev A. V., Rogozin I. V., Nezhdanov A. K. Opubl. 20.01.2003. (In Russ.).
2. Bogachev B. A., Buzalo N. A., Loseva V. E., Filileev A. A. Causes of fatigue cracks in crane girders of heavy duty overhead cranes. Stroitel'stvo i arhitektura, 2023, vol. 11, no. 4, p. 2. (In Russ.). doi: 10.29039/2308-0191-2023-11-4-2-2
3. Pat. Russian Federation No 2486127. A method for increasing the resistance of a crane beam to the dynamic effects of the wheels of overhead cranes. Nezhdanov K. K., Nezhdanov A. K., Klochkov E. V. Opubl. 27.06.2013. (In Russ.).
4. Tusnin A. R., Shchurov E. O. Experimental studies of steel elements reinforced with carbon fiber composite materials. Promyshlennoe i grazhdanskoe stroitel'stvo, 2017, no. 9, pp. 25-29. (In Russ.).
5. Danilov A. I., Kalugin I. A. Reinforcement of stretched elements with polymers based on high-strength fiber. Promyshlennoe i grazhdanskoe stroitel'stvo, 2018, no. 12, pp. 25-31. (In Russ.).
6. Davidenko A. I., Kakuliya A. B., Karabel'nikov M. A. Increased crack resistance of steel crane beams reinforced with high-modulus carbon fiber linings. Vestnik Luganskogo gosudarstvennogo universiteta im. V. Dalya, 2024, no. 3(81), pp. 45-50. (In Russ.).
7. Pshenichkina V. A., Suhina K. N., Suhin K. A., Dubovskij M. E. Analysis of the stress-strain state of metal crane beams, taking into account the inconsistency of the implemented design scheme. Vestnik VolgGASU, 2020, vol. 78, no. 1, pp. 38-46. (In Russ.).
8. Li M. L. Ocenka nagruzhennosti i ustalostnoj dolgovechnosti svarnyh podkrano-vyh balok [Assessment of loading and fatigue life of welded crane beams]. Chelyabinsk, YuUrGU Publ., 2004. 187 p. (In Russ.).
9. Lampsi B. B., Lampsi B. B., Markina Yu. D. Reinforcement of steel crane beams during modernization of the technological process. Privolzhskij nauchnyj zhurnal, 2022, no. 2(62), pp. 24-28. (In Russ.).
10. Sklyadnev A. I. Issues of crack resistance of steel crane beams with horizontal cracks in the wall under the action of concentrated forces from the wheels of an overhead crane. Izvestiya vuzov, 2024, no. 4(784), pp. 44-55. (In Russ.).
11. Alpatov V. Yu., Mordovskij S. S., Lukin A. O., Bushuev S. A. Calculation of a crane beam with a span of 12 m. Available at: https://www.fips.ru/registers-doc-view/fips_servlet?DB=EVM&DocNumber=2021619785&TypeFile=html (accessed 17.10.2024). - For citation: Golubev D. E., Sofronov K. M., Kosenkov V. V., Shurinov A. V., Krasotina L. V. Crane Runway Beam Reconstruction in an Operational Converter Shop. Promyshlennoye i grazhdanskoye stroitel'stvo [Industrial and Civil Engineering], 2025, no. 11, рp. 34-39. (In Russ.). doi: 10.33622/0869-7019.2025.11.34-39