- Evaluating The Effectiveness Of The EVM Model
- UDC 624.05
doi: 10.33622/0869-7019.2024.10.58-65
Vadim N. KABANOV, kabanovvn@yandex.ru
Elena V. MIKHAYLOVA, tranz-volga@yandex.ru
National Research Moscow State Civil Engineering University, Yaroslavskoye shosse, 26, Moscow 129337, Russian Federation
Abstract. The article considers the EVM model and evaluates its efficiency. The authors use the term "capital investment development trajectory" as a synonym for the EVM model. To describe the trajectory (procedure) for financing a capital construction project, it is proposed to use a well-known model of progressive motion of a material point. To construct the EVM model trajectory, special cases of progressive motion are considered, including uniform, uniformly accelerated and uniformly decelerated motion. .By the efficiency of a capital investment project, the authors mean the amount of monetary obligations to the investor that ensures a given level of profitability. The efficiency of the capital investment development trajectory in the EVM model is determined by the amount of obligations accumulated by the time the facility is put into operation (completion of construction). An efficiency criterion is proposed for assessing the capital investment development trajectory in the EVM model, which has significant advantages over traditional approaches to assessing the efficiency of direct investments.
Keywords: trajectory of capital investment development, calendar schedule of construction and installation works, construction duration, investment and construction project, efficiency of capital investments - REFERENCES
1. Ottaviani F.M., De Marco A., Narbaev T., Rebuglio M. Improving project estimates at completion through progress-based performance factors. Buildings, 2024, vol. 14, pp. 643. doi:10.3390/buildings14030643
2. Lк T. A., Huэnh Q. T., Nguyкn T. H. Predict software project completion time and cost using XGBoost. Journal of Military Science and Technology, 2024, vol. 94, pp. 149-158. doi: 10.54939/1859-1043.j.mst.94.2024.149-158
3. Mohamed Matindana D. J., Hassan H. A. Assessments of the application of earned value management system for construction project performance measurement in Zanzibar. Tanzania Journal of Engineering and Technology, 2023, vol. 42(2), pр. 238-249. doi: 10.52339/tjet.v42i2.851
4. Alsugair A. M., Al-Gahtani K. S., Alsanabani N. M. et al. Artificial neural network model to predict final construction contract duration. Appl. Sci., 2023, vol. 13, pp. 8078. doi:10.3390/app13148078
5. Shihabidov A. H. Analysis of projects of the investment and construction complex of the Moscow region. Sistemnye tehnologii, 2023, no. 2(47), pp. 139-145. (In Russ.). doi: 10.55287/22275398.2023.2.139
6. Anichin V. L. Analysis of a "simple" method for calculating the payback period of capital investments. Innovacii v APK: problemy i perspektivy, 2023, no. 3(39), pp. 57-60. (In Russ.).
7. Mihajlova O. A. Features of the formation of capital and operating costs when assessing the investment attractiveness of projects in electrical networks. Jekonomika i predprinimatel'stvo, 2023, no. 6(155), pp. 1066-1070. (In Russ.). doi: 10.34925/EIP.2023.155.6.197
8. Kamandang Z. R., Pahang Putra I N. D., Nauli A. R. A Guideline of earned value method (EVM) Implementation as Decision Baseline on Acceleration Solutions for Construction Project Scheduling. Technium: Romanian Journal of Applied Sciences and Technology, 2023, vol. 16(1), pp. 447-453. doi: 10.47577/technium.v16i.10027
9. Damavandi M., Tavakoli M., Jolai F. Project cost forecasting based on earned value management and Markov chain. Ann Oper Res., 2024. doi: 10.1007/s10479-024-05889-7
10. Bobrova N. M. Formation of a mechanism for controlling the expenditure of investor funds during the implementation of investment projects in the oil and gas sector of the economy. Vestnik Permskogo nacional'nogo issledovatel'skogo politehnicheskogo universiteta. Social'no-jekonomicheskie nauki, 2022, no. 1, pp. 190-202. (In Russ.). doi: 10.15593/2224-9354/2022.1.15
11. Chetchuev M. V. Method for assessing the economic efficiency of railway station development projects. Vestnik Sibirskogo gosudarstvennogo universiteta putej soobshhenija, 2021, no. 4(59), pp. 81-88. (In Russ.). doi: 10.52170/1815-9265.2021.59.81
12. Naderi M., Nazari A., Shafaat A., Abrishami S. Enhancing accuracy in construc-tion overhead cost estimation: a novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 2024. doi: 10.1108/SASBE-07-2023-0180
13. Yang J.-B., Lai T.-H. Selecting EVM, ESM and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 2023,. doi: 10.1108/ECAM-02-2023-0115
14. Barrientos-Orellana A., Ballesteros-Pйrez P., Mora-Meliа D. et al. Comparison of the stability and accuracy of deterministic project cost prediction methods in earned value management. Buildings, 2023, vol. 13, p. 1206. doi: 10.3390/buildings13051206
15. Moshkalev D. S. Methodological approaches to the development and application of a database of analogous objects at the stage of planning capital investments (part 1). Stroitel'stvo. Jekonomika i upravlenie, 2023, no. 3(51), pp. 10-22. (In Russ.).
16. Rebrov O. I. Basic principles of a consolidated assessment of capital investments in the implementation of proposals for the development of regional gas transportation systems of Gazprom at the stage of pre-investment studies. Problemy jekonomiki i upravlenija neftegazovym kompleksom, 2023, no. 1(217), pp. 24-38. (In Russ.). doi: 10.33285/1999-6942-2023-1(217)-24-38
17. Chizhikov S. V. Analysis of the effectiveness of technical and economic modeling at the stage of pre-project assessment of capital investments in the oil and gas industry. Neftjanoe hozjajstvo, 2021, no. 4, pp. 10-16. (In Russ.). doi: 10.24887/0028-2448-2021-4-10-16
18. Zhulanov E. E. Analysis of the effectiveness of technical and economic modeling at the stage of pre-project assessment of capital investments in the oil and gas industry. Vestnik Permskogo nacional'nogo issledovatel'skogo politehnicheskogo universiteta. Social'no-jekonomicheskie nauki, 2022, no. 4, pp. 310-328. (In Russ.). doi: 10.15593/2224-9354/2022.4.22
19. Ahramenko G. V. Regression analysis of the efficiency of road construction in Pripyat Polesie (Republic of Belarus). Vestnik Sibirskogo gosudarstvennogo universiteta putej soobshhenija, 2021, no. 3(58), pp. 96-103. (In Russ.). doi: 10.52170/1815-9265.2021.58.96
20. Levchenko V. N. Factors affecting changes in specific capital investments in construction. Jekonomika stroitel'stva i gorodskogo hozjajstva, 2021, vol. 17, no. 2, pp. 53-63. (In Russ.).
21. Nikitin V. V., Skrypnikov A. V., Berestovoj A. A. et al. Methods of technical and economic assessment of the effectiveness of capital investments in transport development of forest areas. Stroitel'nye i dorozhnye mashiny, 2021, no. 11, pp. 37-42. (In Russ.).
22. Serov V. M. On the property approach in assessing the economic efficiency of investment projects in real sectors of the economy (expansion, reconstruction and technical re-equipment). Jekonomika stroitel'stva, 2021, no. 2(68), pp. 15-20. (In Russ.).
23. Serov V. M., Tihonov Ju. P. On the comparative assessment of the economic efficiency of investment in production capital. Vestnik universiteta, 2023, no. 5, pp. 131-140. (In Russ.). doi: 10.26425/1816-4277-2023-5-131-140
24. Serov V. M., Tihonov Ju. P. Development of a methodology for assessing the economic efficiency of investment projects. Zhurnal jekonomicheskoj teorii, 2021, vol. 18, no. 3, pp. 433-447. (In Russ.). doi: 10.31063/2073-6517/2021.18-3.8
25. Dharmawan R. D., Safarizki H. A., Firdausi A. A. Evaluasi efektivitas keputusan addendum proyek terhadap waktu pekerjaan proyek berbasis earned value method. Jurnal teknik industry, 2023, vol. 1, pp. 51-61. doi: 10.14710/jati.18.1.51-61 - For citation: Kabanov V. N., Mikhaylova E. V. Evaluating the Effectiveness of the EVM Model. Promyshlennoe i grazhdanskoe stroitel'stvo [Industrial and Civil Engineering], 2024, no. 10, pp. 58-65. (In Russ.). doi: 10.33622/0869-7019.2024.10.58-65
BACK